3AK Construction


Mobile +251 911 66 90 00
Mobile 2 +251 911 47 57 34
LocationBole Sub City wereda 06, Addis Ababa, Ethiopia
Primary CategoryElectro-Mechanical contractor
3AK Construction

3AK Construction is a Construction company and has provided quality engineering services in Ethiopia.

The company’s expertise in the Construction of Mechanical, Electrical, and Extra-low voltage systems and provides complete solutions through Design, Engineering & Procurement (DEP) and services across Ethiopia.

3AK Construction has an experienced team that efficiently works together to link their strengths and experiences therefore bringing every customer the best in technical services and project management through experienced on-site project teams, the expertise necessary in management, coordination, planning, purchasing, and quality control.

This way we ensure that projects are completed as per client requirements regarding quality, time, and cost.

Vision

To be a knowledge and innovation-based company that meets customers’ expectations in the Construction sector.

Mission

Providing value-added services and products to our esteemed customers at the right time.

Objective

3AK Construction objectives are:-

      • Construction of buildings, University infrastructure, and water works projects.
      • Installation (Generator, distribution boards, cables, AC, light fixtures, pumps, and other Construction equipment.
      • Design, supervision, and commissioning of Construction work in hotels, hospitals, complex buildings, stadiums and other facilities.
      • Testing of electrical installations as per local and international standards.
      • Building Automation system design, supervision, and installation Renewable energy design and installation (solar)
      • Importing and trading of electrical and mechanical equipment.
      • Building PEB Structure with full technical team.

Core Value

      • Learning Organization,
      • Reliable after-sale service
      • Team spirit
      • Respect
      • Integrity
      • Honesty

The Strategy

      • To strive to provide innovation and world-class solutions through obtaining the best people, processes, and systems with a commitment to partnership and exceptional service.
      • To continue to drive the industry to new levels of sophistication by adding value and applying expert analytical skills to technical, environmental and energy-related issues.
      • To invest in and grow relationships with developers, investors, and service providers alike to provide best-fit solutions to allow maximum productivity and growth therefore mutually benefiting the client and the company.

Strengths

At 3AK we strongly believe in creating our own strengths and so turning everything into an opportunity to benefit from it.

      • End-to-end design, engineering, and construction capability
      • Fast mobilization
      • Sophisticated project management
      • Ability to achieve value engineering and share savings with the client
      • Disciplined procurement
      • Strong record in risk management Page 4
      • Strong diversified management

Competitive advantage

      • Local know-how with global best practices
      • Strong inclination to partnering (Public, Private, Peers)
      • Forward-thinking focused on cost control
      • Honorable corporate values
      • Very good communication with main consultants, civil contractors and other authorities
      • Equipment submittal to show compliance of product to specifications and requirements for approval
      • Periodical client reports to keep you informed of the project’s progress
      • Periodical progress meeting to review, update, and assess project progress so far
      • Material Delivery Report

Our policy

Our philosophy is to focus on prevention and every individual/team is committed to “doing the right things from the first time, every time”.

Pro-active involvement and action are expected from all employees and sub-contractors for we believe that quality, health, safety, and environment (QHSE) protection is the responsibility of everybody.

3AK Construction is committed to prioritizing the health and safety of every person involved in our operations as well as the protection of the environment where their operations take place.

In order to achieve this goal and to build QHSE culture Deal Tech shall:-

      • Provide products and services of the highest possible standards, to satisfy our customers’ needs, and expectations of quality, reliability, and service.
      • Provide leadership by example by managing HSE accountability, authority, and performance as a line responsibility
      • Provide a secure and safe work environment to protect all employees

Experiences Item

Project description

Tasks

1

Kegna Beverages S.C.

Subcontractor of electrical installation of controlling and PEB Element of the whole factory with the supervision of DIO HERADEC KRALOVE S.R.O and Project Soft ( Germany)

2

Seyo Town

  • on the field of wastewater installation
  • pipelines
  • PVC lines
  • and also utility rooms on the boiler

N.B – under the supervision of Dewoto company

3

Arsi Negele Town

  • installation of motors
  • pipeline installation On the water supply]
  • And also 1500m3 tanker
  • all pipelines (stainless tell)

NB- under Oromia water construction.

4

Structural erection works a warehouse PEB used for s and also for structural buildings for manufacturing

Factories in the area of OLENCHITY, MEKI SHASHEMENE, ETEYA, BALE, and BULBULA, at Oromiya Industry Park.

  • installation of PEB Element
  • installation of the digital and analog instrument

NB – under supervision of – MCG Construction

Pipe fittings and welding works

      • Client … National Cement Factory, Dire Dawa
      • Contractor ... National cement factory
      • Subcontractor... Techno Mak Engineering PLC
      • Installation of different sizes of pipes in the area of cement kill processing parts and erect some parts of structural works for supporting each machine parts by using continuous welding.
      • N.B Under the supervision of Techno Mak Engineering PLC.

1. Waste water treatment works

      • Client.. BGI Ethiopia
      • Contractor. Water Leau, Austria
      • Subcontractor. Kihlot Engineering PLC
      • Installation of Wastewater treatment plant working at constructing the tankers, pipes fittings, and welding works in different project sites of BGI beer and wine factories.
      • N.B Under the supervision of Kihlot Engineering PLC

2. Water Treatment Plant and Pipe Fitting, Welding

      • Client. Raya Beer Factory
      • Contractor. DIO HARDEC KRALOVE , Czech Republic
      • Subcontractor. Kihlot Engineering PLC
      • A. Installation of water treatment plant by constructing different sizes of tankers and connecting with the main line also installing the water treatment pumps and each pipes through the treatment system.
      • B. Installation of stainless steel pipe fittings and welding in the area of the beer fermentation house also installing different sizes of steam line pipes with all insulation works.
      • N.B Under supervision of DIO HARDEC KRALOVE

3. Water treatment and Waste water treatment plant.

      • Client. Coca-Cola beverage factory
      • Contractor. Deweto International.
      • Installation of all pipes and supporting works including full welding and also all systems of pipe installation of treated water And steam line.
      • N.B Under the supervision of Deweto International.

4. Water Treatment Plant

      • Client Heineken Beer factory
      • Contractor. GEA, Czech Republic
      • Subcontractor. Deweto International.
      • Installation of water treatment parts consulting with GEA company.
      • N.B Under the supervision of GEA.

5. City Water Project | Mekelle |

      • Client. Mekelle City
      • Contractor. Siram Trading
      • Installation of all pipe and pump station electro-mechanical works and welding pipes at the Mekelle project.
      • N.B Under the supervision of Tigray Construction Enterprise.

6. Substation Power plant | Dire Dawa |

      • Client ...EEPCO | Ethiopian Electric Power corporation |
      • Contractor ... GETA Construction Engineering
      • Installation of Hydrant lines and different sizes of steam line pipes.
      • N.B Under the supervision of GETA Construction Engineering.

7. Vertical tanker and pipelines plant |Addis Ababa, Bole Air port|

      • Client. Total Oil Company
      • Contractor .. GETA Construction Engineering
      • Installation of Hydrant lines and different sizes of diesel pipelines.
      • N.B Under the supervision of GETA Construction Engineering.

8. Water treatment plant | Welqitie|

      • Client .. Zebidar Beer Factory
      • Contractor .. Water Leau | Austria |
      • Subcontractor .. DEWETO International
      • Installation of Water treatment lines including boreholes.
      • N.B Under the supervision of DEWETO International.

9. Harar Water Supply

      • Client .. Harar City Water Supply Bureau
      • Contractor.. Techno Fam Construction Engineering | India |
      • Subcontractor .. Hagbes PLC
      • Installation of Harar water supply including borehole and piping works.
      • N.B. under the supervision of Techno fam Construction PLC.

10. Adama Water Project | Adama |

      • Client. Adama Water Project Bureau
      • Contractor .. Siram Trading
      • Installation of Harar water supply including borehole and piping works.
      • N.B Under supervision of Adama Water Project bureau .

11. Mizan Tepi water project |Tepi |

      • Client .. TEpi water supply bureau
      • Contractor. Hagbes PLC
      • Installation of Harar water supply including borehole and piping works.
      • N.B Under supervision of Tepi Water Project bureau .

12. Adwa water project | Adwa |

      • Client .. Adwa city Water bureau
      • Contractor. Private
      • Installation of Harar water supply including borehole and piping works.
      • N.B Under the upervision of Adwa water bureau Water Project bureau .

13. Shire Water project |Shire |

      • Client Shire Water Supply Bureau
      • Contractor Siram Trading PLC
      • Installation of Harar water supply including borehole and piping works.
      • N.B Under the supervision of Shire Water Bureau Water Project Bureau.

14. Werabie water project | Kero |

      • Client Werabie Water Supply Bureau
      • Contractor  Siram Trading PLC.
      • Installation of Harar water supply including borehole and piping works.
      • N.B Under the supervision of Werabie Water Bureau Water Project Bureau.

15. Gonder Water Project | Gonder |

      • Client. Gonder Water supply
      • Contractor. Hagbes PLC.
      • Installation of Harar water supply including borehole and piping works.
      • N.B Under the supervision of Gonder Water Supply Bureau.

Contact us
Address:- Bole Sub City wereda 06 Addis Ababa, Ethiopia
Telephone:-+251 911 66 90 00, +251 911 47 57 34
Email:- lemmakenean@gmail.com


Products and Services(7 Images)

Shared Banner Directory p8